Spending a half a day correctly preparing
the site makes the work go much smoother and faster. We recommend
the following:
-
All the window and door bucks be
made up before you start the first course.
-
Square and chalk the inside wall
location (spray chalk line with clear paint so you don't lose it).
-
-
Buy steel in 20' straight sections
and in 2' X 2' 90degree sections. If your first wall section is
7 courses high lay 7 corner bar in each corner and cut 7 straight
bars for each of the straight sections.
-
Stack block in the center of the
slab or foundation.
-
Mark on the slab the location and
dimensions of all the openings.
-
When you finish the preparation you
have all the materials in close proximity to where they will be
used and the work flow is smoother and faster. We recommend one
person laying block, one person brining and cutting block and the
third person placing steel.
|
|